Replacing the Roof on a Chicago Bungalow: What a Proper Job Includes
The brick bungalows of Edison Park, Norwood Park, Jefferson Park, Park Ridge and Niles are among the best-built homes in the area, and their roofs fail in the same predictable places.
A well-built house with predictable roof problems
The Chicago bungalow, built by the tens of thousands from the 1910s to the 1930s, is solid brick, compact and sensible. Across the Far Northwest Side and the inner northwest suburbs, from Edison Park and Jefferson Park to Park Ridge and Niles, most of them are now on their third or fourth roof. Because the houses are so similar, the roofs fail in the same handful of places, and a proper replacement deals with every one of them rather than only the shingles you can see from the street.
The chimney flashing
Almost every bungalow has a brick chimney, and the flashing around it is the most common source of leaks we find. Over decades the original metal gets covered with roofing cement instead of being replaced, and cement cracks with every freeze. The fix is new step flashing and counter flashing set into the brick, done during the re-roof when the shingles around the chimney are off anyway. If the crown or mortar needs work, that is masonry, which we manage with partner masons (inside Chicago, a City-licensed mason); see our tuckpointing and brick repair page.
The low-slope rear section
Many bungalows have a flatter section over the rear porch, a dormer or an addition, often too shallow for shingles. Shingling a pitch that is too low is one of the most common causes of recurring leaks on these houses. A proper job switches that section to a low-slope membrane that ties into the shingled roof. Inside Chicago, a replacement low-slope roof also has to meet the City's reflectance rule, which we explain in our post on Chicago's cool roof requirement.
The deck under the shingles
Bungalows were sheathed in solid boards, not plywood. Most of those boards are still sound after a century, but there are usually gaps, past patch jobs and some rot at the eaves or around the chimney. We inspect the deck when the old roof comes off, replace bad boards or add new sheathing where it is needed, and photograph what we find, so you see why a line on the estimate changed.
Ventilation and the attic
Bungalow attics were not built with modern ventilation, and many have since been finished into bedrooms, which makes it harder. Poor ventilation cooks shingles from below in summer and drives ice dams in winter. During the re-roof we add intake at the eaves where the soffit allows it and exhaust at the ridge, and we look at insulation if the attic is open. Our attic ventilation page covers the details.
Gutters, while you are at it
Original or decades-old gutters on a bungalow are often undersized and pitched poorly. Replacing them in the same job costs less than doing it separately later, and new gutters can be hung against fresh drip edge. Our roof, siding and gutters guide explains when combining work makes sense.
What it typically costs
Most bungalow roof replacements fall in the lower part of our $15,000 to $40,000 residential range, because the houses are compact. What moves a specific job up is the number of layers coming off, the amount of deck repair, the chimney and masonry work, the low-slope section, and whether gutters are included. Every estimate we write itemizes those so you can see where the money goes.
Permits, inside the city and out
Inside Chicago a roof replacement needs a City permit and a contractor holding a City General Contractor license; we hold one (Class E, #TGC147129) and pull the permit ourselves. Park Ridge, Niles and the other suburbs have their own permit and inspection process, which we handle the same way.
Frequently asked questions
Can I just reshingle over my bungalow's old roof?
We do not recommend it. A layover hides the deck, the chimney flashing and the low-slope section, which are exactly the parts of a bungalow roof that fail. A full tear-off lets us fix them while everything is open.
How long does a bungalow re-roof take?
Usually one to three working days for the roof itself, depending on the chimney work, deck repair and the low-slope section, and weather.